(!)NOTE : Windows 7 users won’t be able to use some latest features of eCatalog/WOS since Microsoft is ending support for Windows 7 on 14 Jan, 2020. Please upgrade your system for uninterrupted services.

  • Viewed
    Products
  • My
    Components
  • Cart
Recently Viewed Products
X
My Components
X
Cart item(s)
X
Loading...
  • Due to an increase in demand, the lead time of some of the electrical items from our eCatalogue has increased abnormally and may cause delays in delivery or order suspension. We apologize for the inconvenience and appreciate your kind understanding. Once the supply will get normalized, we will update the same.

Steel Pipe Fitting, Screw-In Pipe Fitting, Union Standard (FU-1B-C)

Steel Pipe Fitting, Screw-In Pipe Fitting, Union Standard (FU-1B-C)
You can add up to 6 items per a category to the compare list.

Part Number :
    • Starting From :
      408₹/Unit
  • Order Qty :
  • Total Price :
    ---
  • Days to ship :
    ---

Select part number to Order Now/ Add to Cart

  • CAD Data unavailable

Product Description

Maximum operating pressure: 2.5 MPa (steady flow of water at no more than 120°C or below), 1.0 MPa (steam, air, gas, and oil at no more than 300°C).

Part Number
FU-1B-C
Part NumberPriceMinimum Order Qty.Volume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment

₹ 1,358.53

1 Piece(s) 7 Day(s) or more 1B(25A)Water[Resin Coating] Epoxy Resin Coating

Loading...

  1. 1

Basic Information

Connecting Shape Union Connection Type Screw⇔Screw Same Diameter・Different Type Material STPG370(SCH40)
Connection Thread Type M1 Rc Type Fitting Max. Operating Pressure(MPa) 2.5
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Please check the type/dimensions/specifications of the part FU-1B-C in the Steel Pipe Fitting, Screw-In Pipe Fitting, Union Standard series.

Product variants

Part Number
FU-1/4B-B
FU-1/4B-W
FU-1/8B-B
FU-1B-W
FU-21/2B-B
FU-21/2B-C
Part NumberStandard Unit PriceMinimum order quantityVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment

₹ 467.84

1 Piece(s) 7 Day(s) or more 1/4B(8A)Oil / Air / Water / SteamNo

₹ 420.80

1 Piece(s) 7 Day(s) or more 1/4B(8A)Oil / Air / Water / Gas[Zinc Plating] Hot zinc plating

₹ 467.84

1 Piece(s) 11 Day(s) or more 1/8B(6A)Oil / Air / Water / SteamNo

₹ 707.58

1 Piece(s) 6 Day(s) or more 1B(25A)Oil / Air / Water / Gas[Zinc Plating] Hot zinc plating

₹ 3,689.07

1 Piece(s) 7 Day(s) or more 2 1/2B(65A)Oil / Air / Water / SteamNo

₹ 6,523.24

1 Piece(s) 11 Day(s) or more 2 1/2B(65A)Water[Resin Coating] Epoxy Resin Coating