• MISUMI India HO Gurgaon & Pune regional office will be closed on 21st Oct, 2019 on account of assembly elections in Haryana & Maharashtra constituencies.

Steel Pipe Fitting, Screw-In Pipe Fitting, Union Standard

Steel Pipe Fitting, Screw-In Pipe Fitting, Union Standard

Maximum operating pressure: 2.5 MPa (steady flow of water at no more than 120°C or below), 1.0 MPa (steam, air, gas, and oil at no more than 300°C).

PDF

Japanese Only

Part Number

Configured Part Number is shown.

Part Number
FU-1/2B-B
FU-1/2B-C
FU-1/2B-W
FU-1/4B-B
FU-1/4B-W
FU-1/8B-B
FU-1/8B-W
FU-1B-B
FU-1B-C
FU-1B-W
FU-2B-B
FU-2B-C
FU-2B-W
FU-3/4B-B
FU-3/4B-C
FU-3/4B-W
FU-3/8B-B
FU-3/8B-W
FU-3B-B
FU-3B-C
FU-3B-W
FU-4B-B
FU-4B-C
FU-4B-W
FU-11/2B-B
FU-11/2B-C
FU-11/2B-W
FU-11/4B-B
FU-11/4B-C
FU-11/4B-W
FU-21/2B-B
FU-21/2B-C
FU-21/2B-W
Part NumberVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment
7 Day(s) or more 1/2B(15A)Water / Air / Steam / OilNo
7 Day(s) or more 1/2B(15A)Water[Resin Coating] Epoxy Resin Coating
7 Day(s) or more 1/2B(15A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating
7 Day(s) or more 1/4B(8A)Water / Air / Steam / OilNo
7 Day(s) or more 1/4B(8A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating
12 Day(s) or more 1/8B(6A)Water / Air / Steam / OilNo
12 Day(s) or more 1/8B(6A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating
7 Day(s) or more 1B(25A)Water / Air / Steam / OilNo
7 Day(s) or more 1B(25A)Water[Resin Coating] Epoxy Resin Coating
7 Day(s) or more 1B(25A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating
7 Day(s) or more 2B(50A)Water / Air / Steam / OilNo
7 Day(s) or more 2B(50A)Water[Resin Coating] Epoxy Resin Coating
7 Day(s) or more 2B(50A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating
7 Day(s) or more 3/4B(20A)Water / Air / Steam / OilNo
7 Day(s) or more 3/4B(20A)Water[Resin Coating] Epoxy Resin Coating
6 Day(s) or more 3/4B(20A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating
7 Day(s) or more 3/8B(10A)Water / Air / Steam / OilNo
7 Day(s) or more 3/8B(10A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating
7 Day(s) or more 3B(80A)Water / Air / Steam / OilNo
12 Day(s) or more 3B(80A)Water[Resin Coating] Epoxy Resin Coating
7 Day(s) or more 3B(80A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating
12 Day(s) or more 4B(100A)Water / Air / Steam / OilNo
12 Day(s) or more 4B(100A)Water[Resin Coating] Epoxy Resin Coating
7 Day(s) or more 4B(100A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating
7 Day(s) or more 1 1/2B(40A)Water / Air / Steam / OilNo
7 Day(s) or more 1 1/2B(40A)Water[Resin Coating] Epoxy Resin Coating
6 Day(s) or more 1 1/2B(40A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating
7 Day(s) or more 1 1/4B(32A)Water / Air / Steam / OilNo
7 Day(s) or more 1 1/4B(32A)Water[Resin Coating] Epoxy Resin Coating
7 Day(s) or more 1 1/4B(32A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating
7 Day(s) or more 2 1/2B(65A)Water / Air / Steam / OilNo
12 Day(s) or more 2 1/2B(65A)Water[Resin Coating] Epoxy Resin Coating
7 Day(s) or more 2 1/2B(65A)Water / Air / Gas / Oil[Zinc Plating] Hot zinc plating

Loading...

  1. 1

Basic Information

Type Fitting Connection Type Screw⇔Screw Same Diameter・Different Type Connecting Shape Union
Material STPG370(SCH40) Connection Thread Type M1 Rc Max. Operating Pressure(MPa) 2.5
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
TEL:124- 468-8841 / FAX:124-468-8811
9:00am - 5:30pm (Monday -Saturday)