(!)NOTE : Windows 7 users won’t be able to use some latest features of eCatalog/WOS since Microsoft is ending support for Windows 7 on 14 Jan, 2020. Please upgrade your system for uninterrupted services.

  • Viewed
    Products
  • My
    Components
  • Cart
Recently Viewed Products
X
My Components
X
Cart item(s)
X
Loading...
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Suspension Pipe Fittings, with Tongue (Electro-Galvanized/Stainless Steel/Dip Plating)

Suspension Pipe Fittings, with Tongue (Electro-Galvanized/Stainless Steel/Dip Plating)
You can add up to 6 items per a category to the compare list.

Part Number :
    • Starting From :
      89₹/Unit
  • Order Qty :
  • Total Price :
    ---
  • Days to ship :
    ---

Select part number to Order Now/ Add to Cart

  • CAD Data unavailable

Product Description

Hinge type handing band for SGP pipes and stainless steel pipes (thick pipes)

[Features]
· Hinged hanging band for use with SGP pipes.
· The "turnbuckle" is packed separately.
• Molten Zinc Finish

 
Part Number
A10140-0010
A10140-0024
A10140-0039
A10140-0043
A10140-0058
A10140-0062
A10140-0077
A10140-0081
A10140-0096
A10140-0109
A10140-0113
A10140-0128
A10140-0132
A10140-0147
A10140-0151
A10140-0166
A10140-0185
A10140-0217
A10140-0221
A10140-0471
A10199-0017
A10199-0021
A10199-0036
A10199-0055
A10199-0060
A10199-0074
A10199-0089
A10199-0093
A10199-0106
A10199-0125
A10199-0130
A10199-0144
A10199-0159
A10199-0163
A10199-0178
A10221-0010
A10221-0024
A10221-0039
A10221-0043
A10221-0058
A10221-0062
A10221-0077
A10221-0081
A10221-0096
A10221-0109
A10221-0113
Part NumberPriceMinimum Order Qty.Volume DiscountDays to ShipMain fit tube(or application tube)outside diameter
(mm)
Material Applicable Tube Type Surface Treatment Nominal Diameter (A) Nominal Diameter (B) Compatible Pipe Outer Diameter
(mm)

₹ 120.93

1 Piece(s) 5 Day(s) or more 10~Less than 20SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating10A3/817.3

₹ 93.18

1 Piece(s) 5 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating15A1/221.7

₹ 94.53

1 Piece(s) 5 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating20A3/427.2

₹ 118.40

1 Piece(s) 5 Day(s) or more 30~Less than 40SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating25A134

₹ 88.78

1 Piece(s) 7 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating32A1 1/442.7

₹ 126.40

1 Piece(s) 7 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating40A1 1/248.6

₹ 106.58

1 Piece(s) 5 Day(s) or more 60~Less than 70SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating50A260.5

₹ 166.40

1 Piece(s) 7 Day(s) or more 70~Less than 80SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating65A2 1/276.3

₹ 182.40

1 Piece(s) 5 Day(s) or more 80~Less than 90SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating80A389.1

₹ 124.95

1 Piece(s) 7 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating90A3 1/2101.6

₹ 130.40

1 Piece(s) 5 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating100A4114.3

₹ 494.40

1 Piece(s) 7 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating125A5139.8

₹ 558.40

1 Piece(s) 7 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating150A6165.2

₹ 957.60

1 Piece(s) 12 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating175A7190.7

₹ 518.73

1 Piece(s) 5 Day(s) or more 200~Less than 300SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating200A8216.3

₹ 2,391.20

1 Piece(s) 8 Day(s) or more 200~Less than 300SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating250A10267.4

₹ 3,591.20

1 Piece(s) 7 Day(s) or more 300~Less than 400SteelSGP Pipe[Zinc Plating] Electrolytic Zinc Plating300A12318.5

₹ 127.62

1 Piece(s) 8 Day(s) or more 30~Less than 40SteelSGP Pipe[Zinc Plating] Electrolytic Zinc PlatingVP25V-2532

₹ 135.65

1 Piece(s) 8 Day(s) or more 30~Less than 40SteelSGP Pipe[Zinc Plating] Electrolytic Zinc PlatingVP30V-3038

₹ 122.27

1 Piece(s) 12 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Electrolytic Zinc PlatingVP20V-2026

₹ 951.20

1 Piece(s) 9 Day(s) or more 20~Less than 30[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No15A1/221.7

₹ 712.00

1 Piece(s) 5 Day(s) or more 20~Less than 30[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No20A3/427.2

₹ 1,031.20

1 Piece(s) 5 Day(s) or more 30~Less than 40[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No25A134

₹ 741.60

1 Piece(s) 7 Day(s) or more 40~Less than 50[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No32A1 1/442.7

₹ 1,111.20

1 Piece(s) 5 Day(s) or more 40~Less than 50[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No40A1 1/248.6

₹ 1,191.20

1 Piece(s) 5 Day(s) or more 60~Less than 70[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No50A260.5

₹ 1,431.20

1 Piece(s) 7 Day(s) or more 70~Less than 80[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No65A2 1/276.3

₹ 1,032.00

1 Piece(s) 7 Day(s) or more 80~Less than 90[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No80A389.1

₹ 475.87

1 Piece(s) 8 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No90A3 1/2101.6

₹ 1,106.40

1 Piece(s) 5 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No100A4114.3

₹ 3,511.20

1 Piece(s) 7 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No125A5139.8

₹ 3,260.80

1 Piece(s) 7 Day(s) or more 100~Less than 200[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No150A6165.2

₹ 2,842.58

1 Piece(s) 7 Day(s) or more 200~Less than 300[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No200A8216.3

₹ 7,689.84

1 Piece(s) 12 Day(s) or more 200~Less than 300[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No250A10267.4

₹ 8,462.67

1 Piece(s) 12 Day(s) or more 300~Less than 400[Stainless] Stainless Steel[Stainless Steel Tubes] Stainless Steel Pipe (Thick‐Walled Tube)No300A12318.5

₹ 284.80

1 Piece(s) 8 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)15A1/221.7

₹ 237.60

1 Piece(s) 7 Day(s) or more 20~Less than 30SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)20A3/427.2

₹ 270.40

1 Piece(s) 7 Day(s) or more 30~Less than 40SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)25A134

₹ 368.00

1 Piece(s) 7 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)32A1 1/442.7

₹ 389.60

1 Piece(s) 7 Day(s) or more 40~Less than 50SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)40A1 1/248.6

₹ 400.00

1 Piece(s) 7 Day(s) or more 60~Less than 70SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)50A260.5

₹ 476.00

1 Piece(s) 7 Day(s) or more 70~Less than 80SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)65A2 1/276.3

₹ 497.60

1 Piece(s) 7 Day(s) or more 80~Less than 90SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)80A389.1

₹ 520.80

1 Piece(s) 7 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)100A4114.3

₹ 976.80

1 Piece(s) 7 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)125A5139.8

₹ 1,136.80

1 Piece(s) 7 Day(s) or more 100~Less than 200SteelSGP Pipe[Zinc Plating] Hot zinc plating (dip plating)150A6165.2

Loading...

  1. 1

Basic Information

Type Hanging Band Qty.(piece) 1
X
whatsapp-qr whatsapp-icon