(!)NOTE : Windows 7 users won’t be able to use some latest features of eCatalog/WOS since Microsoft is ending support for Windows 7 on 14 Jan, 2020. Please upgrade your system for uninterrupted services.

  • Viewed
    Products
  • My
    Components
  • Cart
Recently Viewed Products
X
My Components
X
Cart item(s)
X
Loading...
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

[Clean & Pack] Shaft - One End Keyway (Part Number)

[Clean & Pack] Shaft - One End Keyway

Click this image to zoom it.

Move the mouse over or click the image to zoom

You can add up to 6 items per a category to the compare list.

Part Number :
  • Order Qty :
  • Price :
    ---
  • Total Price :
    ---
  • Days to ship :
    ---

Select part number to Order Now/ Add to Cart

(i)

Caution

  • Cleaning also removes rust prevention oil, which may make the product more susceptible to rusting than an uncleaned product. Please be careful about the application location and storage environment.

Product Description

Three types of cleaning methods are available: degreasing, precision cleaning, and electrolytic polishing + precision cleaning. They can be ordered from one piece with the standard part number.
This eliminates the need for customer cleaning or outsourced cleaning, reducing the amount of time and effort required.
■Part Number for Clean & Pack Products
·Degreasing (Anti-rust single packing)    : Part Number SL-□□
·Precision cleaning (Degassing double packing)    : Part Number SH-□□
·Electrolytic polishing + precision cleaning (Degassing double packing): Part Number SHD-□□
Product Part NumberCleaning MethodPackaging TypeEffects Compared to Uncleaned ProductEnvironment (Standard)Process
SL-□□DegreasingAnti-rust packingOil removalGeneral environmentRegular assembly process
Post battery assembly process
SH-□□Precision cleaningDegassing double packingOil removal
Dust removal
Clean environment (Class 10 to 1,000)Battery assembly process
LCD-related post assembly process
In-vehicle camera assembly process
SHD-□□Electrolytic polishing + precision cleaningDegassing double packingOil removal
Dust removal
Outgas reduction
Vacuum environment
Clean environment (Class 10 to 1,000)
Pre-semiconductor process
Liquid crystal deposition process
Pre-OLED process
■Notes
Cleaning also removes rust prevention oil, which may make the product more susceptible to rusting than an uncleaned product.
Please be careful about the application location and storage environment.

Type
Body Material
Cleaning Method
D Tol. f8
[M] Material
[S]Surface Treatment
Cleaning Method
Cleaning Environment
Packaging Type
Packing Environment
SL-PSSFGK
SUS304
Hard Chrome Plating
Plating Hardness: HV750 or more
Plating Thickness: 10µ or more
DegreasingGeneral environmentAnti-rust packingGeneral environment
SH-PSSFGK
Precision cleaning
Class 1,000
Degassing double packing
Class 10
[!] Products are packed by order quantity. Ex. If the order is for 20 pieces, they are packed in one package (incl. 20 pieces).
[ ! ] See the details of degreasing and precision cleaning shown at the bottom of the specification table.

Specification Table

Part Number
L
F
SL-PSSFGK10
265
F25
SH-PSSFGK16
265
F25
D Tol.
D
f8
6
−0.010
−0.028
8
−0.013
−0.035
10
12
−0.016
−0.043
13
15
16
18
20
−0.020
−0.053
25
30
35
−0.025
−0.064
40
50
Part Number
1 mm Increments
W
H
C
Type
D
L
F
D Tol. f8
SL-PSSFGK
SH-PSSFGK
6
20 to 900
5≦F≦L/2
3.1
2
0.5 or Less
8
20 to 1100
10
20 to 1200
3
12
20 to 1400
13
25 to 1400
15
25 to 1400
16
30 to 1400
18
30 to 1400
20
30 to 1400
4
1.0 or less
25
35 to 1400
5
30
35 to 1500
7≦F≦L/2
5.1
6
35
35 to 1500
7
40
50 to 1500
8
50
65 to 1500
10

Alteration Details

·See below for alteration.
 * When selecting multiple alterations, the distance between machined areas should be 2 mm or more.

Alteration CodeAlteration Details Fixed DimensionApplicable Conditions Ordering Example
LKC

Shaft - One End Keyway, Related Image 1_Alteration Details

·L < 200 >> L ± 0.03
·200≦L<500→L±0.05
·L≧500→L±0.1
L dimension can be specified in 0.1 mm increments.SFAK16-625.5-F25-LKC
SC

Shaft - One End Keyway, Related Image 2_Alteration Details

DW1 DW1
658 181610
87 2017
108 2522
121010 302715
1311 3530
1513 403620
1614 5041
SC = 1 mm Increments
SC+ℓ1≦L
SC≧0
SFAK16-625-F25-SC5
Cleaning Process
·Degreasing (Part Number: SL-□□)

Working Environment: General environment

Alkaline warm pure water 
Ultrasonic pure water
cleaning after cleaning
with pure water
 
*3 times
 Dry Anti-rust single packing
·Precision cleaning (Part Number: SH-□□)
    

Working Environment: Class 1,000

 

Working Environment: Class 10

Hydrocarbon cleaning
Ro water cleaning
 Wash with pure
water (10 MΩ·cm) after
high-pressure water
jet cleaning (Ro water)
 Use pure water
(13 MΩ·cm)
 Use nitrogen blow 
Conducted on a clean
bench in a Class 10
clean environment
·Electrolytic polishing + precision cleaning (Part Number: SHD-□□)
      

Working Environment: Class 1,000

 

Working Environment: Class 10

Hydrocarbon cleaning
Ro water cleaning
 Electrolytic polishing
with an electrolytic
polishing layer according
to the material
 Wash with pure
water (10 MΩ·cm) after
high-pressure water
jet cleaning (Ro water)
 Use warm pure water
(13 MΩ·cm)
 Use nitrogen blow 
Conducted on a clean
bench in a Class 10
clean environment
Packaging Example
For degreasing:
(Part Number: SL-□□)
For precision cleaning or electrolytic polishing + precision cleaning:
(Part Number: SH-□□/SHD-□□)

[ ! ]Both the first and second layer packaging are degassed.
Cleaning Effectiveness / Recommended Environment for Use

Cleaning Method

Product Part Number

Packaging Type

Effects Compared to Uncleaned Product

Environment (Standard)

Use Case and Process

DegreasingSL-□□Anti-rust packingOil removalGeneral environmentRegular assembly process
Post battery assembly process
Precision cleaningSH-□□Degassing double packingOil removal
Dust removal
Clean environment (Class 10 to 1,000)Battery assembly process
LCD-related post assembly process
In-vehicle camera assembly process
Electrolytic polishing + precision cleaningSHD-□□Degassing double packingOil removal
Dust removal
Outgas reduction
Vacuum environment
Clean environment (Class 10 to 1,000)
Pre-semiconductor process
Liquid crystal deposition process
Pre-OLED process

Part Number 

  • Incomplete part number.
    Please use left hand selections to complete a part number.
Loading...
Part Number
SH-PSSFGK6-[20-800/1]-F[0-300/1]
SH-PSSFGK8-[20-800/1]-F[0-300/1]
SH-PSSFGK10-[20-800/1]-F[0-400/1]
SH-PSSFGK12-[20-800/1]-F[0-500/1]
SH-PSSFGK13-[25-800/1]-F[0-500/1]
SH-PSSFGK15-[25-800/1]-F[0-600/1]
SH-PSSFGK16-[30-800/1]-F[0-600/1]
SH-PSSFGK18-[30-800/1]-F[0-600/1]
SH-PSSFGK20-[30-800/1]-F[0-600/1]
SH-PSSFGK25-[35-800/1]-F[0-600/1]
SH-PSSFGK30-[35-800/1]-F[0-750/1]
SH-PSSFGK35-[35-800/1]-F[0-750/1]
SH-PSSFGK40-[50-800/1]-F[0-750/1]
SH-PSSFGK50-[65-800/1]-F[0-750/1]
SL-PSSFGK6-[20-800/1]-F[0-300/1]
SL-PSSFGK8-[20-800/1]-F[0-300/1]
SL-PSSFGK10-[20-800/1]-F[0-400/1]
SL-PSSFGK12-[20-800/1]-F[0-500/1]
SL-PSSFGK13-[25-800/1]-F[0-500/1]
SL-PSSFGK15-[25-800/1]-F[0-600/1]
SL-PSSFGK16-[30-800/1]-F[0-600/1]
SL-PSSFGK18-[30-800/1]-F[0-600/1]
SL-PSSFGK20-[30-800/1]-F[0-600/1]
SL-PSSFGK25-[35-800/1]-F[0-600/1]
SL-PSSFGK30-[35-800/1]-F[0-750/1]
SL-PSSFGK35-[35-800/1]-F[0-750/1]
SL-PSSFGK40-[50-800/1]-F[0-750/1]
SL-PSSFGK50-[65-800/1]-F[0-750/1]
Part NumberPriceMinimum Order Qty.Volume DiscountDays to ShipShaft Dia. D
(Ø)
Length L
(mm)
Cleaning Method F
(㎜)

-

1 Piece(s) 12 Day(s) or more 620 ~ 800Precision Cleaning0 ~ 300

-

1 Piece(s) 12 Day(s) or more 820 ~ 800Precision Cleaning0 ~ 300

-

1 Piece(s) 12 Day(s) or more 1020 ~ 800Precision Cleaning0 ~ 400

-

1 Piece(s) 12 Day(s) or more 1220 ~ 800Precision Cleaning0 ~ 500

-

1 Piece(s) 12 Day(s) or more 1325 ~ 800Precision Cleaning0 ~ 500

-

1 Piece(s) 12 Day(s) or more 1525 ~ 800Precision Cleaning0 ~ 600

-

1 Piece(s) 12 Day(s) or more 1630 ~ 800Precision Cleaning0 ~ 600

-

1 Piece(s) 12 Day(s) or more 1830 ~ 800Precision Cleaning0 ~ 600

-

1 Piece(s) 12 Day(s) or more 2030 ~ 800Precision Cleaning0 ~ 600

-

1 Piece(s) 12 Day(s) or more 2535 ~ 800Precision Cleaning0 ~ 600

-

1 Piece(s) 12 Day(s) or more 3035 ~ 800Precision Cleaning0 ~ 750

-

1 Piece(s) 12 Day(s) or more 3535 ~ 800Precision Cleaning0 ~ 750

-

1 Piece(s) 12 Day(s) or more 4050 ~ 800Precision Cleaning0 ~ 750

-

1 Piece(s) 12 Day(s) or more 5065 ~ 800Precision Cleaning0 ~ 750

-

1 Piece(s) 12 Day(s) or more 620 ~ 800Degreasing0 ~ 300

-

1 Piece(s) 12 Day(s) or more 820 ~ 800Degreasing0 ~ 300

-

1 Piece(s) 12 Day(s) or more 1020 ~ 800Degreasing0 ~ 400

-

1 Piece(s) 12 Day(s) or more 1220 ~ 800Degreasing0 ~ 500

-

1 Piece(s) 12 Day(s) or more 1325 ~ 800Degreasing0 ~ 500

-

1 Piece(s) 12 Day(s) or more 1525 ~ 800Degreasing0 ~ 600

-

1 Piece(s) 12 Day(s) or more 1630 ~ 800Degreasing0 ~ 600

-

1 Piece(s) 12 Day(s) or more 1830 ~ 800Degreasing0 ~ 600

-

1 Piece(s) 12 Day(s) or more 2030 ~ 800Degreasing0 ~ 600

-

1 Piece(s) 12 Day(s) or more 2535 ~ 800Degreasing0 ~ 600

-

1 Piece(s) 12 Day(s) or more 3035 ~ 800Degreasing0 ~ 750

-

1 Piece(s) 12 Day(s) or more 3535 ~ 800Degreasing0 ~ 750

-

1 Piece(s) 12 Day(s) or more 4050 ~ 800Degreasing0 ~ 750

-

1 Piece(s) 12 Day(s) or more 5065 ~ 800Degreasing0 ~ 750

Loading...

  1. 1

Basic Information

Basic Shape Solid End Shape (Left) Keyway End Shape (Right) No Machining
Shaft End Perpendicularity Perpendicularity (0.2) Material S45C Heat Treatment Not Provided
Surface Treatment Hard Chrome Plating Shaft Fit Tolerance f8 Hardness Not induction hardened
Material Certificate Available Material Certificate: Material SUS304
X
whatsapp-qr whatsapp-icon