(!)NOTE : Windows 7 users won’t be able to use some latest features of eCatalog/WOS since Microsoft is ending support for Windows 7 on 14 Jan, 2020. Please upgrade your system for uninterrupted services.
Select part number to Order Now/ Add to Cart
This is a blank before cutting edge processing for a type of punch that is fixed with bolts. It has been heat treated and the shank diameter D has been finished to the specified tolerance.
Part Number |
---|
A-MPB5-[40-80/10] |
A-MPB5-LC[20-79.9/0.1] |
A-MPB6-[40-80/10] |
A-MPB6-LC[20-79.9/0.1] |
A-MPB8-[40-100/10] |
A-MPB8-LC[20-99.9/0.1] |
A-MPB10-[40-100/10] |
A-MPB10-LC[20-99.9/0.1] |
A-MPB13-[40-100/10] |
A-MPB13-LC[20-99.9/0.1] |
A-MPB16-[40-100/10] |
A-MPB16-LC[20-99.9/0.1] |
A-MPB20-[40-100/10] |
A-MPB20-LC[20-99.9/0.1] |
A-MPB25-[40-100/10] |
A-MPB25-LC[20-99.9/0.1] |
A-MPHB5-[40-80/10] |
A-MPHB5-LC[20-79.9/0.1] |
A-MPHB6-[40-80/10] |
A-MPHB6-LC[20-79.9/0.1] |
A-MPHB8-[40-100/10] |
A-MPHB8-LC[20-99.9/0.1] |
A-MPHB10-[40-100/10] |
A-MPHB10-LC[20-99.9/0.1] |
A-MPHB13-[40-100/10] |
A-MPHB13-LC[20-99.9/0.1] |
A-MPHB16-[40-100/10] |
A-MPHB16-LC[20-99.9/0.1] |
A-MPHB20-[40-100/10] |
A-MPHB20-LC[20-99.9/0.1] |
A-MPHB25-[40-100/10] |
A-MPHB25-LC[20-99.9/0.1] |
MPB5-[40-80/10] |
MPB5-LC[20-79.9/0.1] |
MPB6-[40-80/10] |
MPB6-LC[20-79.9/0.1] |
MPB8-[40-100/10] |
MPB8-LC[20-99.9/0.1] |
MPB10-[40-100/10] |
MPB10-LC[20-99.9/0.1] |
MPB13-[40-100/10] |
MPB13-LC[20-99.9/0.1] |
MPB16-[40-100/10] |
MPB16-LC[20-99.9/0.1] |
MPB20-[40-100/10] |
MPB20-LC[20-99.9/0.1] |
MPB25-[40-100/10] |
MPB25-LC[20-99.9/0.1] |
MPHB5-[40-80/10] |
MPHB5-LC[20-79.9/0.1] |
MPHB6-[40-80/10] |
MPHB6-LC[20-79.9/0.1] |
MPHB8-[40-100/10] |
MPHB8-LC[20-99.9/0.1] |
MPHB10-[40-100/10] |
MPHB10-LC[20-99.9/0.1] |
MPHB13-[40-100/10] |
MPHB13-LC[20-99.9/0.1] |
MPHB16-[40-100/10] |
MPHB16-LC[20-99.9/0.1] |
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Material | Shank diameter D tolerance | D (Shank diameter) (mm) | L (L dimension) (mm) | LC (Full length alteration) (mm) |
---|---|---|---|---|---|---|---|---|---|---|
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 5 | 40 ~ 80 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 5 | - | 20 ~ 79.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 6 | 40 ~ 80 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 6 | - | 20 ~ 79.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 8 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 8 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 10 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 10 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 13 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 13 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 16 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 16 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 20 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 20 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 25 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | +0.005/0 | 25 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 5 | 40 ~ 80 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 5 | - | 20 ~ 79.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 6 | 40 ~ 80 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 6 | - | 20 ~ 79.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 8 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 8 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 10 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 10 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 13 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 13 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 16 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 16 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 20 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 20 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 25 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | +0.005/0 | 25 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 5 | 40 ~ 80 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 5 | - | 20 ~ 79.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 6 | 40 ~ 80 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 6 | - | 20 ~ 79.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 8 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 8 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 10 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 10 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 13 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 13 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 16 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 16 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 20 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 20 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 25 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | SKD11 Equivalent | m5 | 25 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 5 | 40 ~ 80 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 5 | - | 20 ~ 79.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 6 | 40 ~ 80 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 6 | - | 20 ~ 79.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 8 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 8 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 10 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 10 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 13 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 13 | - | 20 ~ 99.9 | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 16 | 40 ~ 100 | - | ||
- | 1 Piece(s) | 2 Day(s) | 10 | Powdered high-speed steel | m5 | 16 | - | 20 ~ 99.9 |
Loading...
Heavy-load punches | No | Shank type | Blank | Jector | None |
---|---|---|---|---|---|
Surface treatment | None | Shank (mounting part) shape | Tapped | Specification | Tap standard type |
How can we improve?
How can we improve?
Thank you for your time.
Your feedback is essential for our continuous improvement
Privacy Policy
Thank you for your cooperation.
Thank you for your time.
Your feedback is essential for our continuous improvement
Please use the inquiry form.
Privacy Policy