(!)NOTE : Windows 7 users won’t be able to use some latest features of eCatalog/WOS since Microsoft is ending support for Windows 7 on 14 Jan, 2020. Please upgrade your system for uninterrupted services.
Select part number to Order Now/ Add to Cart
Capable of machining hardened materials of hardness exceeding 60 HRC. Suitable for machining in deep locations.
Part Number |
---|
3360-006.000 |
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to Ship | Overall Length (L) (mm) | Underneck length (ℓ3) (mm) | Shank diameter (d) (mm) | blade diameter d1 (mm) | Effective length of blade l2 (mm) | Neck base diameter d3 (mm) | Ball Radius r (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|
₹ 10,561.09 | 1 Piece(s) | 5 Day(s) or more | 75 | 39 | 6 | 6 | 9 | 5.7 | 3 |
Loading...
Type | Ball | Number of flutes(sheet) | 2 | Coating | Other |
---|---|---|---|---|---|
Torsional Angle(°) | 30 | Tool Material | Carbide | Standard | G.S. |
Coating Details | FIRE | Blade diameter tolerance | h8 |
Please check the type/dimensions/specifications of the part 3360-006.000 in the Ball End Mill Long Neck 2-Flute for High Hardness Steel GF300B 3360 series.
Part Number |
---|
3360-003.000 |
3360-004.000 |
3360-005.000 |
3360-008.000 |
3360-010.000 |
3360-012.000 |
Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Overall Length (L) (mm) | Underneck length (ℓ3) (mm) | Shank diameter (d) (mm) | blade diameter d1 (mm) | Effective length of blade l2 (mm) | Neck base diameter d3 (mm) | Ball Radius r (mm) |
---|---|---|---|---|---|---|---|---|---|---|---|
₹ 8,777.02 | 1 Piece(s) | 5 Day(s) or more | 75 | 39 | 6 | 3 | 5 | 2.7 | 1.5 | ||
₹ 9,674.42 | 1 Piece(s) | 5 Day(s) or more | 75 | 39 | 6 | 4 | 6 | 3.7 | 2 | ||
₹ 10,025.33 | 1 Piece(s) | 5 Day(s) or more | 75 | 39 | 6 | 5 | 8 | 4.7 | 2.5 | ||
₹ 12,880.93 | 1 Piece(s) | 5 Day(s) or more | 100 | 64 | 8 | 8 | 12 | 7.7 | 4 | ||
₹ 16,641.95 | 1 Piece(s) | 5 Day(s) or more | 100 | 60 | 10 | 10 | 15 | 9.5 | 5 | ||
₹ 24,868.49 | 1 Piece(s) | 5 Day(s) or more | 150 | 105 | 12 | 12 | 18 | 11.5 | 6 |
How can we improve?
How can we improve?
Thank you for your time.
Your feedback is essential for our continuous improvement
Privacy Policy
Thank you for your cooperation.
Thank you for your time.
Your feedback is essential for our continuous improvement
Please use the inquiry form.
Privacy Policy