(!)NOTE : Windows 7 users won’t be able to use some latest features of eCatalog/WOS since Microsoft is ending support for Windows 7 on 14 Jan, 2020. Please upgrade your system for uninterrupted services.
Select part number to Order Now/ Add to Cart
New generation lever IL-BRID Series.
[Features]
・ The newly-developed IL-BRID lever is made of stainless steel and has smooth resin.
The manufacturer has adopted the latest design in which these 2 contradictory features are perfectly coordinated.
・ When you operate the lever, the resin part first engages the peg to reduce friction and then slides and is fixed.
・ After that, the stainless steel part is fixed to the peg to ensure a high load capacity.
・ Low friction makes it suitable for frequent insertion and removal applications.
Part Number | Price | Minimum Order Qty. | Related To | Volume Discount | Days to Ship | RoHS | Applicable pin/contact | Connection direction | Application | M/N/O | A/B/C | Connector series initials | Representative Standard | Part names | Operating Temperature Range (Min) (°C) | Operating Temperature Range (Max) (°C) | Enclosure type | Hood Entry Direction | Entry dimensions (mm) | Enclosure size (mm) | Material | Details | Connector Series First Letters details | Product type | Variant | Style | Cable entry | Size | Note | Application |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
₹ 2,761.43 | 1 Piece(s) | 6 Day(s) or more | - | Other | Straight | Cable Connection | - | Other | A/B/C | UL / CUL | - | - | - | - | - | - | - | - | - | CZAP | With 1 lever | - | High construction | Pg21 × 2 | 66.16 | - | - | |||
₹ 4,039.10 | 1 Piece(s) | 6 Day(s) or more | - | Other | - | Cable Connection | - | Other | A/B/C | - | - | - | - | - | - | - | - | - | - | CZAP | With 1 lever | With metal cover | High construction | Pg16 | 66.16 | - | - | |||
₹ 4,130.91 | 1 Piece(s) | 6 Day(s) or more | - | Other | - | Cable Connection | - | Other | A/B/C | - | - | - | - | - | - | - | - | - | - | CZAP | With 1 lever | With metal cover | High construction | Pg16 × 2 | 66.16 | - | - | |||
₹ 4,041.24 | 1 Piece(s) | 6 Day(s) or more | - | Other | - | Cable Connection | - | Other | A/B/C | - | - | - | - | - | - | - | - | - | - | CZAP | With 1 lever | With metal cover | High construction | Pg21 | 66.16 | - | - | |||
- | ₹ 4,007.14 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | A/B/C | UL / CUL | Hood | - | - | Standard | Top | 16 | 49.16 | - | High construction / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 4,250.00 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | A/B/C | UL / CUL | Hood | - | - | Standard | Top | 21 | 49.16 | - | High construction / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 4,208.53 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | A/B/C | UL / CUL | Hood | - | - | Standard | Double top | 16 (2 entry) | 66.16 | - | With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,067.20 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | A/B/C | UL / CUL | Bulkhead housing | - | - | Standard | - | - | 66.16 | - | With Lever | - | - | - | - | - | - | - | - | ||
- | ₹ 2,818.57 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | A/B/C | UL / CUL | Hood | - | - | Standard | Side | 16 | 49.16 | - | With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,931.43 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | A/B/C | UL / CUL | Hood | - | - | Standard | Side | 16 | 66.16 | - | With pegs | - | - | - | - | - | - | - | - | ||
₹ 2,264.00 | 1 Piece(s) | 6 Day(s) or more | - | Other | - | Cable Connection | - | Other | A/B/C | - | - | - | - | - | - | - | - | - | - | CZP | With 1 lever | - | - | Pg21 × 2 | 49.16 | - | - | |||
₹ 3,808.53 | 1 Piece(s) | 6 Day(s) or more | - | Other | - | Cable Connection | - | Other | A/B/C | - | - | - | - | - | - | - | - | - | - | CZP | With 1 lever | With metal cover | - | Pg16 | 49.16 | - | - | |||
₹ 4,391.25 | 1 Piece(s) | 6 Day(s) or more | - | Other | - | Cable Connection | - | Other | A/B/C | UL / CUL | - | - | - | - | - | - | - | - | - | CZP | With 1 lever | With metal cover | - | Pg16 × 2 | 49.16 | - | - | |||
₹ 3,817.08 | 1 Piece(s) | 6 Day(s) or more | - | Other | - | Cable Connection | - | Other | A/B/C | - | - | - | - | - | - | - | - | - | - | CZP | With 1 lever | With metal cover | - | Pg21 | 49.16 | - | - | |||
- | ₹ 4,387.45 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | A/B/C | UL / CUL | BOX housing | - | - | Standard | - | 21 (2 entry) | 49.16 | - | With cover / With lever | - | - | - | - | - | - | - | - | ||
- | ₹ 2,273.60 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Side | 20 | 49.16 | - | High construction / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,387.20 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Side | 25 | 49.16 | - | High construction / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,445.18 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Side | 20 | 66.16 | - | High construction / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,508.45 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Side | 25 | 66.16 | - | High construction / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,729.05 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | BOX housing | - | - | Standard | - | 25 | 66.16 | - | With lever / High construction | - | - | - | - | - | - | - | - | ||
- | ₹ 2,784.42 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | BOX housing | - | - | Standard | - | 25 (2 entry) | 66.16 | - | With lever / High construction | - | - | - | - | - | - | - | - | ||
₹ 4,040.13 | 1 Piece(s) | 6 Day(s) or more | - | Other | Straight, angle | Cable Connection | [Other] Other | - | M/N/O | - | - | - | - | - | - | - | - | - | - | MZAP | With 1 lever | With metal cover | High construction | M25 | 66.16 | - | - | |||
₹ 4,136.47 | 1 Piece(s) | 6 Day(s) or more | - | Other | Straight, angle | Cable Connection | [Other] Other | - | M/N/O | UL / CUL | - | - | - | - | - | - | - | - | - | MZAP | With 1 lever | With metal cover | High construction | M25 × 2 | 66.16 | - | - | |||
- | ₹ 2,266.40 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Top | 20 | 49.16 | - | High construction / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,380.00 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Top | 25 | 49.16 | - | High construction / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,395.20 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Top | 20 | 66.16 | - | High construction / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,505.60 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Top | 25 | 66.16 | - | High construction / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 4,272.82 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Double top | 20 (2 entry) | 66.16 | - | With pegs | - | - | - | - | - | - | - | - | ||
₹ 1,852.80 | 1 Piece(s) | 6 Day(s) or more | - | Other | Straight, angle | Cable Connection | [Other] Other | - | M/N/O | - | - | - | - | - | - | - | - | - | - | MZFO | With 2 pegs | Side entry, without adapter | High construction | M20 | 49.16 | - | - | |||
- | ₹ 1,800.00 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Side | 25 | 49.16 | - | High construction / Without adapter / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 1,979.29 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Side | 20 | 66.16 | - | High construction / Without adapter / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 1,979.29 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Side | 25 | 66.16 | - | High construction / Without adapter / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 1,823.29 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Top | 20 | 49.16 | - | High construction / Without adapter / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 1,796.47 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Top | 25 | 49.16 | - | High construction / Without adapter / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,080.94 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Top | 20 | 66.16 | - | High construction / Without adapter / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,080.94 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Top | 25 | 66.16 | - | High construction / Without adapter / With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,753.91 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Double top | 20 (2 entry) | 66.16 | - | With pegs / Without adapter | - | - | - | - | - | - | - | - | ||
- | ₹ 1,666.59 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Side | 20 | 49.16 | - | With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 1,744.94 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Side | 20 | 66.16 | - | With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 1,762.59 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Side | 25 | 66.16 | - | With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,527.49 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | BOX housing | - | - | Standard | - | 25 | 49.16 | - | With Lever | - | - | - | - | - | - | - | - | ||
- | ₹ 2,596.02 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | BOX housing | - | - | Standard | - | 25 (2 entry) | 49.16 | - | With Lever | - | - | - | - | - | - | - | - | ||
₹ 3,804.26 | 1 Piece(s) | 6 Day(s) or more | - | Other | Straight, angle | Cable Connection | [Other] Other | - | M/N/O | - | - | - | - | - | - | - | - | - | - | MZP | With 1 lever | With metal cover | - | M25 | 49.16 | - | - | |||
- | ₹ 6,960.00 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | BOX housing | - | - | Standard | - | 25 (2 entry) | 49.16 | - | With cover / With lever | - | - | - | - | - | - | - | - | ||
- | ₹ 1,672.24 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Top | 20 | 49.16 | - | With pegs | - | - | - | - | - | - | - | - | ||
- | ₹ 2,980.13 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood | - | - | Standard | Top | 20 | 49.16 | - | With Lever | - | - | - | - | - | - | - | - | ||
- | ₹ 3,085.60 | 1 Piece(s) | 5 Day(s) or more | 10 | - | - | Cable Connection | - | - | M/N/O | UL / CUL | Hood (for relay) | - | - | Standard | Top | 20 | 66.16 | - | With Lever | - | - | - | - | - | - | - | - |
Loading...
Protection function (environmentally resistant) | Available | Connector Shape | Square shape |
---|
How can we improve?
How can we improve?
Thank you for your time.
Your feedback is essential for our continuous improvement
Privacy Policy
Thank you for your cooperation.
Thank you for your time.
Your feedback is essential for our continuous improvement
Please use the inquiry form.
Privacy Policy