(!)NOTE : Windows 7 users won’t be able to use some latest features of eCatalog/WOS since Microsoft is ending support for Windows 7 on 14 Jan, 2020. Please upgrade your system for uninterrupted services.
A wide variety of standard and configurable components for factory automation engineers in industries such as automotive, semiconductor, packaging, medical and many more.
A good selection of accessories such as screws, bolts, washers and nuts that you may need for your daily engineering usage.
Browse industrial materials ranging from heat insulating plates, sponges, to metal and plastic materials in different sizes to meet your various applications.
A wide variety of wiring parts for connecting and protecting control and PC parts including Connectors, Cables, Electric Wires, Crimping Terminals and more.
A wide variety of controls and PC parts for electrical engineers including Controls, Powers, PC parts and more.
A wide variety of cutting tools for many uses and work materials including End Mills, Drills, Cutters, Reamers, Turning Tools and more.
A wide variety of tools and supplies used in processing including Machine Tools, Measurement Tools, Grinding and Polishing Supplies and more.
A wide variety of goods used in shipment, material handling and warehouse including Tape supplies, Stretch film, Truck, Shelf, Crane and more.
A large variety of goods for every kind of factories and offices including Protection items, Cleaning supplies, sanitations, office supplies and more.
A large variety of items used in R&D and Clean Room including research Equipment, Laboratory Essentials, Analysis Supplies, Clean Environment-Related Equipment and more.
Choose from thousands of standard stamping die components including Punch & Die, Gas Springs, Guide Components, Coil Springs and many more.
Browse our wide variety of mold components including Ejector Pins, Sleeves, Leader Components, Sprue Bushings and many more.
Browse our injection molding components including Heating Items, Couplers, Hoses and more.
Use a screwdriver to insert crimp terminals (round/Y types) or to remove wiring and wires. Release the wires by pressing the release button (labor-saving design). A compact type terminal with a pitch of just 5 mm (space saving design).
[Features]
· A clutch lock (screw-less) type with 1-to-1 wiring (screw-less type). Dedicated connection for crimp terminals.
Part Number
Configured Part Number is shown.
Part Number |
---|
TIFY520CM |
TIFY520CP |
TIFY520CPM |
TIFY520MH |
TIFY534MH |
TIFY540F360 |
TIFY540MH |
TIFY550MH |
Part Number | Volume Discount | Days to Ship | Connector | Number of Poles (Pole) | Supported equipment | Supported equipment manufacturer | Representative Standard | Dimension width (mm) | Connector manufacturer | Type of Common | Internal Connection |
---|---|---|---|---|---|---|---|---|---|---|---|
26 Day(s) or more | [Other] Other | 20 | - | - | CE / UL | 55 | - | Upper and lower levels minus | - | ||
26 Day(s) or more | [Other] Other | 20 | - | - | CE / UL | 55 | - | Upper and lower levels plus | - | ||
11 Day(s) or more | [Other] Other | 20 | - | - | CE / UL | 55 | - | Upper level plus, lower level minus | - | ||
11 Day(s) or more | MIL Connector | 20 | PLC/servo other | Mitsubishi Electric / Omron / KEYENCE | CE / UL | 64 | Hirose | - | 1 to 1 Connection | ||
11 Day(s) or more | MIL Connector | 34 | PLC | KEYENCE | CE / UL | 90 | Hirose | - | 1 to 1 Connection | ||
11 Day(s) or more | FCN Connector | 40 | PLC/servo other | Mitsubishi Electric / Omron / KEYENCE | CE | 105 | Fujitsu | - | 1 to 1 Connection | ||
11 Day(s) or more | MIL Connector | 40 | PLC/servo other | Mitsubishi Electric / Omron / Panasonic Electronic Works / KEYENCE | CE / UL | 105 | Hirose | - | 1 to 1 Connection | ||
16 Day(s) or more | MIL Connector | 50 | Servo Motor | - | CE / UL | 130 | Hirose | - | 1 to 1 Connection |
Loading...
Mounting Method | DIN rail/Direct attachment | Pitch Between Terminals(mm) | 5 | Dimension vertical(mm) | 59 |
---|---|---|---|---|---|
Dimension depth(mm) | 42 |
PATLITE (KASUGA)
Days to Ship : 11 Day(s) or more
OMRON
Days to Ship : Same day or more
TOYOGIKEN
Days to Ship : 11 Day(s) or more
WAGO
Days to Ship : 11 Day(s) or more
TOYOGIKEN
Days to Ship : 11 Day(s) or more
OMRON
Days to Ship : Same day or more
PATLITE (KASUGA)
Days to Ship : 11 Day(s) or more
How can we improve?
How can we improve?
Thank you for your time.
Your feedback is essential for our continuous improvement
Privacy Policy
Thank you for your cooperation.
Thank you for your time.
Your feedback is essential for our continuous improvement
Please use the inquiry form.
Privacy Policy