(!)NOTE : Windows 7 users won’t be able to use some latest features of eCatalog/WOS since Microsoft is ending support for Windows 7 on 14 Jan, 2020. Please upgrade your system for uninterrupted services.

  • Due to the ongoing COVID pandemic, we are expecting an increase in the delivery lead time of our shipments due to delay in domestic transportation. We request you to kindly bear with us. For any information please contact us at CS@misumi.co.in. We apologize for the inconvenience and appreciate your kind patience and understanding.
  • Due to current drastic freight increment, we may suspend to receiving orders for long profile product more than 2,600mm length. If you have any inquiries, please contact with CS@misumi.co.in or call to +91-124-468-8800.

KT-1 Strainer

KT-1 Strainer

Straight-type strainer that dispels the concept of strainers, capable of eliminating conventional problems with maintainability, buildability, pressure loss, etc., all at once.

[Features]
• Straight type strainer with a brand new strainer concept.
· Issues in conventional strainers such as maintainability, workability or pressure-loss are resolved all at once.
• Because the KT-1A type can inspect the net using a single bolt, cleaning frequency is ideal for many places.

PDF

Japanese Only

Part Number

Configured Part Number is shown.

 
Part Number
KT1-G-50A
KT1-G-65A
KT1-G-80A
KT1-G-100A
KT1-G-125A
KT1-G-150A
KT1-G-200A
KT1-G-250A
KT1-G-300A
KT1-M-50A
KT1-M-65A
KT1-M-80A
KT1-M-100A
KT1-M-125A
KT1-M-150A
KT1-M-200A
KT1-M-250A
KT1-M-300A
Part NumberVolume DiscountDays to ShipMaterial Supply Side, Nominal Diameter of Flange
40 Day(s) or more [Cast Iron] FC2B(50A)
40 Day(s) or more [Cast Iron] FC2 1/2B(65A)
40 Day(s) or more [Cast Iron] FC3B(80A)
40 Day(s) or more [Cast Iron] FC4B(100A)
12 Day(s) or more [Cast Iron] FC5B(125A)
12 Day(s) or more [Cast Iron] FC6B(150A)
12 Day(s) or more [Cast Iron] FC8B(200A)
45 Day(s) or more [Cast Iron] FC10B(250A)
89 Day(s) or more [Cast Iron] FC12B(300A)
40 Day(s) or more [Cast Iron] FCD2B(50A)
40 Day(s) or more [Cast Iron] FCD2 1/2B(65A)
40 Day(s) or more [Cast Iron] FCD3B(80A)
40 Day(s) or more [Cast Iron] FCD4B(100A)
35 Day(s) or more [Cast Iron] FCD5B(125A)
35 Day(s) or more [Cast Iron] FCD6B(150A)
35 Day(s) or more [Cast Iron] FCD8B(200A)
14 Day(s) or more [Cast Iron] FCD10B(250A)
45 Day(s) or more [Cast Iron] FCD12B(300A)

Loading...

  1. 1

Basic Information

Applicable Fluid Water / Air / Steam Shape T Shaped Supply Side, End Connection JIS 10K FF flange
Supply Side, End Connection JIS 10K FF flange Maximum Applicable Pressure(MPa) 1.0 Mesh 60 Meshes
Fluid temperature(℃) 184 or Less

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
TEL:124- 468-8841 / FAX:124-468-8811
9:00am - 5:30pm (Monday -Saturday)