(!)NOTE : Windows 7 users won’t be able to use some latest features of eCatalog/WOS since Microsoft is ending support for Windows 7 on 14 Jan, 2020. Please upgrade your system for uninterrupted services.
Select part number to Order Now/ Add to Cart
[Features]
· Supports handling with wide range of products including thin, light weight, wide stroke and high precision type, etc.
· This series is under revision of the CAD data.
· Please wait until revision is completed.
Part Number |
---|
BHE-01CS |
BHE-01CS-[D,H,R] |
BHE-01CS-[T2H,T2V,T3H,T3V] |
BHE-01CS-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-01CS-[T2H,T2V,T3H,T3V][3,5] |
BHE-01CS-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-01CS-[D,DE,E] |
BHE-01CS-[D,DE,E]-[D,H,R] |
BHE-01CS-[D,DE,E]-[T2H,T2V,T3H,T3V] |
BHE-01CS-[D,DE,E]-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-01CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5] |
BHE-01CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-03CS |
BHE-03CS-[D,H,R] |
BHE-03CS-[T2H,T2V,T3H,T3V] |
BHE-03CS-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-03CS-[T2H,T2V,T3H,T3V][3,5] |
BHE-03CS-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-03CS-[D,DE,E] |
BHE-03CS-[D,DE,E]-[D,H,R] |
BHE-03CS-[D,DE,E]-[T2H,T2V,T3H,T3V] |
BHE-03CS-[D,DE,E]-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-03CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5] |
BHE-03CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-04CS |
BHE-04CS-[D,H,R] |
BHE-04CS-[T2H,T2V,T3H,T3V] |
BHE-04CS-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-04CS-[T2H,T2V,T3H,T3V][3,5] |
BHE-04CS-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-04CS-[D,DE,E] |
BHE-04CS-[D,DE,E]-[D,H,R] |
BHE-04CS-[D,DE,E]-[T2H,T2V,T3H,T3V] |
BHE-04CS-[D,DE,E]-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-04CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5] |
BHE-04CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-05CS |
BHE-05CS-[D,H,R] |
BHE-05CS-[T2H,T2V,T3H,T3V] |
BHE-05CS-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-05CS-[T2H,T2V,T3H,T3V][3,5] |
BHE-05CS-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-05CS-[D,DE,E] |
BHE-05CS-[D,DE,E]-[D,H,R] |
BHE-05CS-[D,DE,E]-[T2H,T2V,T3H,T3V] |
BHE-05CS-[D,DE,E]-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-05CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5] |
BHE-05CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-06CS |
BHE-06CS-[D,H,R] |
BHE-06CS-[T2H,T2V,T3H,T3V] |
BHE-06CS-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-06CS-[T2H,T2V,T3H,T3V][3,5] |
BHE-06CS-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
BHE-06CS-[D,DE,E] |
BHE-06CS-[D,DE,E]-[D,H,R] |
BHE-06CS-[D,DE,E]-[T2H,T2V,T3H,T3V] |
BHE-06CS-[D,DE,E]-[T2H,T2V,T3H,T3V]-[D,H,R] |
BHE-06CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5] |
BHE-06CS-[D,DE,E]-[T2H,T2V,T3H,T3V][3,5]-[D,H,R] |
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to Ship | Open Dimension L1 (mm) | Stroke Adjustment Mechanism | Size | Lead Wire Length | Number of Switches | Switch |
---|---|---|---|---|---|---|---|---|---|---|
- | 1 Piece(s) | 18 Day(s) or more | 7 | No | 01CS | 1m | NA | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 7 | No | 01CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 7 | No | 01CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 7 | No | 01CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 7 | No | 01CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 7 | No | 01CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 7 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 01CS | 1m | NA | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 7 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 01CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 7 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 01CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 7 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 01CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 7 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 01CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 7 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 01CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 10 | No | 03CS | 1m | NA | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 10 | No | 03CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 10 | No | 03CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 10 | No | 03CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 10 | No | 03CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 10 | No | 03CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 10 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 03CS | 1m | NA | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 10 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 03CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 10 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 03CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 10 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 03CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 10 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 03CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 10 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 03CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 14 | No | 04CS | 1m | NA | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 14 | No | 04CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 14 | No | 04CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 14 | No | 04CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 14 | No | 04CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 14 | No | 04CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 14 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 04CS | 1m | NA | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 14 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 04CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 14 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 04CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 14 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 04CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 14 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 04CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 14 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 04CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 16 | No | 05CS | 1m | NA | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 16 | No | 05CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 16 | No | 05CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 16 | No | 05CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 16 | No | 05CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 16 | No | 05CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 16 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 05CS | 1m | NA | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 16 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 05CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 16 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 05CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 16 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 05CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 16 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 05CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 16 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 05CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 22 | No | 06CS | 1m | NA | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 22 | No | 06CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 22 | No | 06CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 22 | No | 06CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 22 | No | 06CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 22 | No | 06CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 22 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 06CS | 1m | NA | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 22 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 06CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | NA | ||
- | 1 Piece(s) | 18 Day(s) or more | 22 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 06CS | 1m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 22 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 06CS | 1m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 22 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 06CS | 3 m / 5 m | NA | T2H / T2V / T3H / T3V | ||
- | 1 Piece(s) | 18 Day(s) or more | 22 | Opening Direction Adjustment / Adjustment of the Closing Direction / Open-Close Both Sides Adjustment | 06CS | 3 m / 5 m | With Closed Side x1 / With Open Side x1 / 2 pieces included | T2H / T2V / T3H / T3V |
Loading...
Type | Main Body | Gripping Methods | Inserted Parallel Type / Parallel Type of Opening | Number of Fingers | 2 pcs. |
---|---|---|---|---|---|
Main Body Shape | Square type | Closed Dimension L2(mm) | 0 | Environment, Applications | Standard |
Additional Functions | Bearing support / High accuracy | Operating Pressure Range(MPa) | 0.2::0.7 |
How can we improve?
How can we improve?
Thank you for your time.
Your feedback is essential for our continuous improvement
Privacy Policy
Thank you for your cooperation.
Thank you for your time.
Your feedback is essential for our continuous improvement
Please use the inquiry form.
Privacy Policy