(!)NOTE : Windows 7 users won’t be able to use some latest features of eCatalog/WOS since Microsoft is ending support for Windows 7 on 14 Jan, 2020. Please upgrade your system for uninterrupted services.

  • Viewed
    Products
  • My
    Components
  • Cart
Recently Viewed Products
X
My Components
X
Cart item(s)
X
Loading...
  • Notice of End of Sales for Economy Series Pneumatic Equipment Category. More information.

Pivot Pins Shouldered, Hex Socket Head, Lock Nut

Pivot Pins Shouldered, Hex Socket Head, Lock Nut
You can add up to 6 items per a category to the compare list.

Part Number :
  • Order Qty :
  • Price :
    ---
  • Total Price :
    ---
  • Days to ship :
    ---

Select part number to Order Now/ Add to Cart

  • CAD Data unavailable
Product Overview
The hinge pin can be used as the pivot point of various rotary connection mechanisms. The pivot point is similar to the axis of a hinge, and the connected parts can make rotary movements.
Dimensional Drawing
Pivot Pins Shouldered, Lock Nut, Dimensional Drawing HINGE PINS
This type may have centering holes depending on dimensions.
The dimension of the relief groove on the shoulder and neck is a reference value.
For L Dimension, common cutting and machining tolerances (medium class) are used.
E-CLBR, E-CLBRU, E-PCLBR and E-PCLBRU have identification grooves on the side in order to distinguish them from the hardened type.
Specifications Overview
・Material Table
TypeD[Φ:mm] Equivalent Material Hardness Surface Treatment Accessory (1 pcs)
Standard NutU-NutStandard NutU-Nut
E-CLBRE-CLBRU4~25General structural steel or carbon steel-Ferroferric Oxide Protective Film SWRCH SS400
(UNUTK)
E-CLBRHE-CLBRHUHRC40~
E-PCLBRE-PCLBRU-Electroless Nickel Plating Austenitic stainless steel Austenitic stainless steel
(UNUTS)
E-PCLBRHE-PCLBRHUHRC40~
E-GCLBRE-GCLBRUPlating hardness 750HV~Hard Chrome Plated SWRM SS400(UNUTK)
E-SCLBRE-SCLBRUAustenitic stainless steel-- Austenitic stainless steel Austenitic stainless steel
(UNUTS)
E-SCLBRHE-SCLBRHUMartensitic stainless steelHRC45~
E-GSCLBRE-GSCLBRUHRC45~
Plating hardness 750HV~
Hard Chrome Plated
If there are requirements for rust prevention, give priority to products made of austenitic stainless steel, hard-chrome plated products or those with surface treatment of electroless nickel plating.
E-SCLBRH, E-SCLBRHU, E-GSCLBR and E-GSCLBRU may be discolored due to hardening.
For U-Nut specifications, click U-Nut
Specification Table
Part NumberL
0.1mm increments
ATFBE(u)(n)M
(Coarse Thread)
Attached Nut
TypeD
Standard Nut
E-CLBR
E-CLBRH
E-PCLBR
E-PCLBRH
E-GCLBR
E-SCLBR
E-SCLBRH
E-GSCLBR
U-Nut
E-CLBRU
E-CLBRHU
E-PCLBRU
E-PCLBRHU
E-GCLBRU
E-SCLBRU
E-SCLBRHU
E-GSCLBRU
410.0~ 50.07562.523.91.5M 3M 3×0.5
510.0~ 60.094.9M 4M 4×0.7
610.0~100.0109 35.8M 5M 5×0.8
810.0~100.013 537.8M 6M 6×1.0
101612 649.8M 8M 8×1.25
1210.0~150.0181611.8M10M10×1.5
1320.0~150.0241812.8M12M12×1.75
14 8513.8
1514.8
1620.0~150.015.8
1716.8
182417.8
202710619.8M16M16×2.0
2220.0~150.021.8
253012824.8
E-SCLBRH, E-SCLBRHU, E-GSCLBR and E-GSCLBRU may be discolored due to hardening.
D Tolerance (g7)
4~6-0.004
-0.016
8・10-0.005
-0.020
12~18-0.006
-0.024
20~25-0.007
-0.028
Product Features
Feature 1: It has a tolerance of g7 and is used in conjunction with bearings.
Feature 2: Available in various shapes. The shapes include straight cotter pin type, straight retaining ring type, shouldered cotter pin type, shouldered retaining ring type, shouldered lock nut type, set screw type, shouldered set screw type, and both ends tapped type.
Feature 3: Products made of austenitic stainless steel with excellent anti-rust performance and products with the surface treatment of hard-chrome plating or electroless nickel plating are available for selection to solve the problem of rusting.
Feature 4: L Dimension Configurable type, freely selectable in 0.1mm increments to accommodate different use environments.
Precautions
①Dg7 tolerance is limited to the L dimension range. Others are general tolerances.
②Anti-rust specification selection and maintenance.
If there are requirements for rust prevention, give priority to products made of austenitic stainless steel, products with surface treatment of hard chrome plating or those with surface treatment of electroless nickel plating.
 Products without surface treatment need to be applied antirust oil regularly for maintenance.
③This product comes with 1 nut, so take care to avoid missing upon receipt.
④Alteration is only applicable to the L dimension configurable type.
Example of Use
Pivot Pins Shouldered, Hex Socket Head, Lock Nut, Complete Specifications, Low Price, High Precision
Application Industries
Electronic & Electrical Automotive Lithium battery
Pivot Pins Shouldered, Hex Socket Head, Lock Nut, Complete Specifications, Low Price, High Precision Pivot Pins Shouldered, Hex Socket Head, Lock Nut, Direct-from-Manufacturer, Low Price, Short Delivery Time Pivot Pins Shouldered, Hex Socket Head, Lock Nut, Complete Specifications, Low Price, High Precision
Robotics Smart Phones Semiconductor
Pivot Pins Shouldered, Hex Socket Head, Lock Nut, Widely Used in Many Industries Pivot Pins Shouldered, Hex Socket Head, Lock Nut, Direct-from-Manufacturer, Low Price, Short Delivery Time Pivot Pins Shouldered, Hex Socket Head, Lock Nut, Complete Specifications, Low Price, High Precision
Related Products
Adjustment Screw Components Hex Socket on Head Single Bearing Type with Retaining Ring Embedded Packed Gasket Ring Fixed/Gasket Ring
Pivot Pins Shouldered, Hex Socket Head, Lock Nut, Widely Used in Many Industries Pivot Pins Shouldered, Hex Socket Head, Lock Nut, Nut Models Pivot Pins Shouldered, Hex Socket Head, Lock Nut, Material Table HINGE
Representative model: ANB8-40 Representative model: BGRR6000ZZ Representative model: PCIMR6-12-0.1
Advantages: manual adjustment and positioning, optional length Advantages: full range, high precision Advantages: full range, high precision and high quality
Related Documents
For anti-rust performance of metal materials and surface treatment, refer to Anti-Rust Performance Table
For U-Nut specifications, refer to U-Nut
Part Number
E-CLBRH4-[10-50/0.1]
E-CLBRH5-[10-60/0.1]
E-CLBRH6-[10-100/0.1]
E-CLBRH8-[10-100/0.1]
E-CLBRH10-[10-100/0.1]
E-CLBRH12-[10-150/0.1]
E-CLBRH13-[20-150/0.1]
E-CLBRH14-[20-150/0.1]
E-CLBRH15-[20-150/0.1]
E-CLBRH16-[20-150/0.1]
E-CLBRH17-[20-150/0.1]
E-CLBRH18-[20-150/0.1]
E-CLBRH20-[20-150/0.1]
E-CLBRH22-[20-150/0.1]
E-CLBRH25-[20-150/0.1]
E-CLBRHU5-[10-60/0.1]
E-CLBRHU6-[10-100/0.1]
E-CLBRHU8-[10-100/0.1]
E-CLBRHU10-[10-100/0.1]
E-CLBRHU12-[10-150/0.1]
E-CLBRHU13
E-CLBRHU14-[20-150/0.1]
E-CLBRHU15-[20-150/0.1]
E-CLBRHU16-[20-150/0.1]
E-CLBRHU17-[20-150/0.1]
E-CLBRHU18-[20-150/0.1]
E-CLBRHU20-[20-150/0.1]
E-CLBRHU22-[20-150/0.1]
E-CLBRHU25-[20-150/0.1]
E-GCLBR4-[10-50/0.1]
E-GCLBR5-[10-60/0.1]
E-GCLBR6-[10-100/0.1]
E-GCLBR8-[10-100/0.1]
E-GCLBR10-[10-100/0.1]
E-GCLBR12-[10-150/0.1]
E-GCLBR13-[20-150/0.1]
E-GCLBR14-[20-150/0.1]
E-GCLBR15-[20-150/0.1]
E-GCLBR16-[20-150/0.1]
E-GCLBR17-[20-150/0.1]
E-GCLBR18-[20-150/0.1]
E-GCLBR20-[20-150/0.1]
E-GCLBR22-[20-150/0.1]
E-GCLBR25-[20-150/0.1]
E-GCLBRU5-[10-60/0.1]
E-GCLBRU6-[10-100/0.1]
E-GCLBRU8-[10-100/0.1]
E-GCLBRU10-[10-100/0.1]
E-GCLBRU12-[10-150/0.1]
E-GCLBRU13-[20-150/0.1]
E-GCLBRU14-[20-150/0.1]
E-GCLBRU15-[20-150/0.1]
E-GCLBRU16-[20-150/0.1]
E-GCLBRU17-[20-150/0.1]
E-GCLBRU18-[20-150/0.1]
E-GCLBRU20-[20-150/0.1]
E-GCLBRU22-[20-150/0.1]
E-GCLBRU25-[20-150/0.1]
E-GSCLBR4-[10-50/0.1]
E-GSCLBR5-[10-60/0.1]
Part NumberPriceMinimum Order Qty.Volume DiscountDays to ShipRoHSShaft Dia. D
(mm)
Material Hardness Surface Treatment Material Detail Accessories L Dimension Tolerance
(mm)

-

1 Piece(s) 9 Day(s) 104SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut10 ~ 50

-

1 Piece(s) 9 Day(s) 105SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut10 ~ 60

-

1 Piece(s) 9 Day(s) 106SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut10 ~ 100

-

1 Piece(s) 9 Day(s) 108SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut10 ~ 100

-

1 Piece(s) 9 Day(s) 1010SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut10 ~ 100

-

1 Piece(s) 9 Day(s) 1012SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut10 ~ 150

-

1 Piece(s) 9 Day(s) 1013SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1014SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1015SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1016SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1017SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1018SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1020SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1022SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1025SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 105SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut10 ~ 60

-

1 Piece(s) 9 Day(s) 106SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut10 ~ 100

-

1 Piece(s) 9 Day(s) 108SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut10 ~ 100

-

1 Piece(s) 9 Day(s) 1010SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut10 ~ 100

-

1 Piece(s) 9 Day(s) 1012SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut10 ~ 150

₹ 1,558.00

1 Piece(s) 9 Day(s) 1013SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut-

-

1 Piece(s) 9 Day(s) 1014SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1015SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1016SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1017SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1018SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1020SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1022SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1025SteelHardness RequirementBlack OxideGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 104SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut10 ~ 50

-

1 Piece(s) 9 Day(s) 105SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut10 ~ 60

-

1 Piece(s) 9 Day(s) 106SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut10 ~ 100

-

1 Piece(s) 9 Day(s) 108SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut10 ~ 100

-

1 Piece(s) 9 Day(s) 1010SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut10 ~ 100

-

1 Piece(s) 9 Day(s) 1012SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut10 ~ 150

-

1 Piece(s) 9 Day(s) 1013SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1014SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1015SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1016SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1017SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1018SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1020SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1022SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1025SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelStandard Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 105SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut10 ~ 60

-

1 Piece(s) 9 Day(s) 106SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut10 ~ 100

-

1 Piece(s) 9 Day(s) 108SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut10 ~ 100

-

1 Piece(s) 9 Day(s) 1010SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut10 ~ 100

-

1 Piece(s) 9 Day(s) 1012SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut10 ~ 150

-

1 Piece(s) 9 Day(s) 1013SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1014SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1015SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1016SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1017SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1018SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1020SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1022SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 1025SteelHardness RequirementHard Chrome PlatingGeneral structural steel or carbon steelU-Nut20 ~ 150

-

1 Piece(s) 9 Day(s) 104Stainless SteelHardness RequirementHard Chrome PlatingMartensite stainless steelStandard Nut10 ~ 50

-

1 Piece(s) 9 Day(s) 105Stainless SteelHardness RequirementHard Chrome PlatingMartensite stainless steelStandard Nut10 ~ 60

Loading...

Basic Information

Mounting Method Nut (Threaded) Basic Shape Shouldered D Tolerance Selection g7
Type L configurable Hex Socket Provided
X
whatsapp-qr whatsapp-icon