(!)NOTE : Windows 7 users won’t be able to use some latest features of eCatalog/WOS since Microsoft is ending support for Windows 7 on 14 Jan, 2020. Please upgrade your system for uninterrupted services.
Select part number to Order Now/ Add to Cart
This is an R/taper integrated pilot punch that features both a smooth tip shape and highly accurate overall length tolerance, and the punch holding part and tip positioning part have the same diameter. This is effective when the installation pitch of the pilot punch is small. Various TiCN-based and DLC-based coatings are applied.
Part Number |
---|
H-HTFRF1.6-[10-40/0.1]-P[1-1.6/0.01] |
H-HTFRF2.0-[10-40/0.1]-P[1-2/0.01] |
H-HTFRF2.5-[10-40/0.1]-P[1.5-2.5/0.01] |
H-HTFRF3-[10-40/0.1]-P[2-3/0.01] |
H-HTFRF4-[10-40/0.1]-P[3-4/0.01] |
H-HTFRF5-[10-40/0.1]-P[4-5/0.01] |
H-HTFRF6-[10-40/0.1]-P[5-6/0.01] |
H-HTFRF8-[10-40/0.1]-P[6-8/0.01] |
H-PTFRF1.6-[10-40/0.1]-P[1-1.6/0.01] |
H-PTFRF2.0-[10-40/0.1]-P[1-2/0.01] |
H-PTFRF2.5-[10-40/0.1]-P[1.5-2.5/0.01] |
H-PTFRF3-[10-40/0.1]-P[2-3/0.01] |
H-PTFRF4-[10-40/0.1]-P[3-4/0.01] |
H-PTFRF5-[10-40/0.1]-P[4-5/0.01] |
H-PTFRF6-[10-40/0.1]-P[5-6/0.01] |
H-PTFRF8-[10-40/0.1]-P[6-8/0.01] |
N-HTFRF1.6-[10-40/0.1]-P[1-1.6/0.01] |
N-HTFRF2.0-[10-40/0.1]-P[1-2/0.01] |
N-HTFRF2.5-[10-40/0.1]-P[1.5-2.5/0.01] |
N-HTFRF3-[10-40/0.1]-P[2-3/0.01] |
N-HTFRF4-[10-40/0.1]-P[3-4/0.01] |
N-HTFRF5-[10-40/0.1]-P[4-5/0.01] |
N-HTFRF6-[10-40/0.1]-P[5-6/0.01] |
N-HTFRF8-[10-40/0.1]-P[6-8/0.01] |
N-PTFRF1.6-[10-40/0.1]-P[1-1.6/0.01] |
N-PTFRF2.0-[10-40/0.1]-P[1-2/0.01] |
N-PTFRF2.5-[10-40/0.1]-P[1.5-2.5/0.01] |
N-PTFRF3-[10-40/0.1]-P[2-3/0.01] |
N-PTFRF4-[10-40/0.1]-P[3-4/0.01] |
N-PTFRF5-[10-40/0.1]-P[4-5/0.01] |
N-PTFRF6-[10-40/0.1]-P[5-6/0.01] |
N-PTFRF8-[10-40/0.1]-P[6-8/0.01] |
Part Number | Price | Minimum Order Qty. | Volume Discount | Days to Ship | RoHS | Material | Surface treatment | No. (Nominal diameter) (mm) | L (L dimension) (mm) | P (Tip dimension) (mm) |
---|---|---|---|---|---|---|---|---|---|---|
- | 1 Piece(s) | 8 Day(s) or more | 10 | SKH51 Equivalent | TiCN | 1.6 | 10 ~ 40 | 1 ~ 1.6 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | SKH51 Equivalent | TiCN | 2.0 | 10 ~ 40 | 1 ~ 2 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | SKH51 Equivalent | TiCN | 2.5 | 10 ~ 40 | 1.5 ~ 2.5 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | SKH51 Equivalent | TiCN | 3 | 10 ~ 40 | 2 ~ 3 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | SKH51 Equivalent | TiCN | 4 | 10 ~ 40 | 3 ~ 4 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | SKH51 Equivalent | TiCN | 5 | 10 ~ 40 | 4 ~ 5 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | SKH51 Equivalent | TiCN | 6 | 10 ~ 40 | 5 ~ 6 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | SKH51 Equivalent | TiCN | 8 | 10 ~ 40 | 6 ~ 8 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | Powdered high-speed steel | TiCN | 1.6 | 10 ~ 40 | 1 ~ 1.6 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | Powdered high-speed steel | TiCN | 2.0 | 10 ~ 40 | 1 ~ 2 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | Powdered high-speed steel | TiCN | 2.5 | 10 ~ 40 | 1.5 ~ 2.5 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | Powdered high-speed steel | TiCN | 3 | 10 ~ 40 | 2 ~ 3 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | Powdered high-speed steel | TiCN | 4 | 10 ~ 40 | 3 ~ 4 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | Powdered high-speed steel | TiCN | 5 | 10 ~ 40 | 4 ~ 5 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | Powdered high-speed steel | TiCN | 6 | 10 ~ 40 | 5 ~ 6 | ||
- | 1 Piece(s) | 8 Day(s) or more | 10 | Powdered high-speed steel | TiCN | 8 | 10 ~ 40 | 6 ~ 8 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | SKH51 Equivalent | Without DLC foundation | 1.6 | 10 ~ 40 | 1 ~ 1.6 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | SKH51 Equivalent | Without DLC foundation | 2.0 | 10 ~ 40 | 1 ~ 2 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | SKH51 Equivalent | Without DLC foundation | 2.5 | 10 ~ 40 | 1.5 ~ 2.5 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | SKH51 Equivalent | Without DLC foundation | 3 | 10 ~ 40 | 2 ~ 3 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | SKH51 Equivalent | Without DLC foundation | 4 | 10 ~ 40 | 3 ~ 4 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | SKH51 Equivalent | Without DLC foundation | 5 | 10 ~ 40 | 4 ~ 5 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | SKH51 Equivalent | Without DLC foundation | 6 | 10 ~ 40 | 5 ~ 6 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | SKH51 Equivalent | Without DLC foundation | 8 | 10 ~ 40 | 6 ~ 8 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | Powdered high-speed steel | Without DLC foundation | 1.6 | 10 ~ 40 | 1 ~ 1.6 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | Powdered high-speed steel | Without DLC foundation | 2.0 | 10 ~ 40 | 1 ~ 2 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | Powdered high-speed steel | Without DLC foundation | 2.5 | 10 ~ 40 | 1.5 ~ 2.5 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | Powdered high-speed steel | Without DLC foundation | 3 | 10 ~ 40 | 2 ~ 3 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | Powdered high-speed steel | Without DLC foundation | 4 | 10 ~ 40 | 3 ~ 4 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | Powdered high-speed steel | Without DLC foundation | 5 | 10 ~ 40 | 4 ~ 5 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | Powdered high-speed steel | Without DLC foundation | 6 | 10 ~ 40 | 5 ~ 6 | ||
- | 1 Piece(s) | 14 Day(s) or more | 10 | Powdered high-speed steel | Without DLC foundation | 8 | 10 ~ 40 | 6 ~ 8 |
Loading...
Shank type | Straight | Tip shape | Tip R & taper | Mounting plate | Stripper plate |
---|---|---|---|---|---|
Shank (mounting part) shape | Standard |
How can we improve?
How can we improve?
Thank you for your time.
Your feedback is essential for our continuous improvement
Privacy Policy
Thank you for your cooperation.
Thank you for your time.
Your feedback is essential for our continuous improvement
Please use the inquiry form.
Privacy Policy